All photographs features work by moGio. Copyright 2003-11 by moGio London. Content Updated - 23.04.2011
Budget STARTING FROM
£4999
Design, Procurement £350 or 10% prior total furniture and trade materials cost.
Design, Procurement £200 or 15% prior total furniture and trade materials cost.
Budget STARTING FROM
£3999
Design, Procurement £400 or 15% prior total furniture and trade materials cost.
Budget STARTING FROM
£2900
basic
comfort
premium
STAGE 1 - Outline Design Study
1.1 - Site Survey
1.2 - Draw up plans to scale
1.3 - Space planning - Draw interior layouts
STAGE 2 - Design Development
2.1 - Research into all items/
prices within the Design Proposal
2.2 - Produce specification
with budget to be signed off
2.3 - Detailed specification
STAGE 3 - Design detail
3.1 - Coloured plans
3.2 - Additional drawings required
- elevations/ wall finishes
3.3 - 3D Visuals
3.4 - Purchases suites, trade materials
3.5 Labour
Quality and installation check
On site consultation with fitters - 2 hours
STAGE 1 - Outline Design Study
1.1 - Site Survey
1.2 - Draw up plans to scale
1.3 - Space planning - Draw interior layouts
1.4 Labour
Quality and installation check
On site consultation with fitters - 1 hour
STAGE 1 - Outline Design Study
1.1 - Site Survey
1.2 - Draw up plans to scale
1.3 - Space planning
- Draw interior layouts
STAGE 2 - Design Development
2.1 - Research into all items/
prices within the Design Proposal
2.2 - Produce specification
with budget to be signed off
2.3 - Detailed specification
STAGE 3 - Design detail
3.1 - Coloured plans
3.2 - Additional drawings required
- elevations/ wall finishes
3.3 - 3D Visuals
STAGE 4 - Procurement and Completion
4.1 - Set up accounts with suppliers
4.2 - Purchases suites, trade materials
4.3 - Order and purchase items
4.4 - Labour
4.5 - Project manage
Quality and installation check
On site consultation with fitters - 4 hours
Here you can find packages that include design, installation and procurement. First, decide what is your budget, then choose your package. Please contact us if you require future assistance.
Labour: Removal, tile, plumbing, carpentry, electrical, fixing, finishing
Suites: Bath, basin, taps, thermostatic valves, shower head, chrome trap, wall & floor tiles
Trade materials Aqua panels, plumbing fitxtures, adhesives, grout, wood, screws