All photographs features work by moGio. Copyright 2003-11 by moGio London.  Content Updated - 23.04.2011

bathroom cost
bathroom designers

Budget STARTING FROM

£4999

Design, Procurement £350 or 10% prior  total furniture and trade materials cost.

Design, Procurement £200 or 15% prior  total furniture and trade materials cost.

Budget STARTING FROM

£3999

wet room design

Design, Procurement £400 or 15% prior  total furniture and trade materials cost.

Budget STARTING FROM

£2900

basic

comfort

premium

small wet room design
small wet room design

STAGE 1 - Outline Design Study

1.1 - Site Survey

1.2 - Draw up plans to scale

1.3 - Space planning - Draw interior layouts


STAGE 2 - Design Development

2.1 - Research into all items/

prices within the Design Proposal

2.2 - Produce specification

with budget to be signed off

2.3 - Detailed specification


STAGE 3 - Design detail

3.1 - Coloured plans

3.2 - Additional drawings required

- elevations/ wall finishes

3.3 - 3D Visuals

3.4 - Purchases suites, trade materials

3.5 Labour


Quality and installation check

On site consultation with fitters - 2 hours

STAGE 1 - Outline Design Study

1.1 - Site Survey

1.2 - Draw up plans to scale

1.3 - Space planning - Draw interior layouts

1.4 Labour


Quality and installation check

On site consultation with fitters - 1 hour

STAGE 1 - Outline Design Study

1.1 - Site Survey

1.2 - Draw up plans to scale

1.3 - Space planning

- Draw interior layouts


STAGE 2 - Design Development

2.1 - Research into all items/

prices within the Design Proposal

2.2 - Produce specification

with budget to be signed off

2.3 - Detailed specification


STAGE 3 - Design detail

3.1 - Coloured plans

3.2 - Additional drawings required

- elevations/ wall finishes

3.3 - 3D Visuals


STAGE 4 - Procurement and Completion 

4.1 - Set up accounts with suppliers

4.2 - Purchases suites, trade materials

4.3 - Order and purchase items

4.4 - Labour

4.5 - Project manage


Quality and installation check

On site consultation with fitters - 4 hours

Here you can find packages that include  design, installation and procurement. First, decide what is your budget, then choose your package. Please contact us if you require future assistance.

Labour: Removal, tile, plumbing, carpentry, electrical, fixing, finishing

Suites: Bath, basin, taps, thermostatic valves, shower head, chrome trap, wall & floor tiles

Trade materials Aqua panels, plumbing fitxtures, adhesives, grout, wood, screws